195 MELOPEE SCHOOL, GHENT, 2015 – 2020
In the harbour area a narrow stretch of land along a dock is freed from port activities.
A very simple ‘chop stick’ urban plan is developed by O.M.A. in which green open pockets alternate with dense construction. In order to offer a notion of centrality to the linear plan, a public path is meant to cross the whole strip. The site for the school faces one green area at its south side, the dock on its west side, a square and a housing block on the north and the harbour road on the east. The requested program for the building, a combination of a primary school, an after school care centre, a nursery and sports facilities for both the school and its neighbourhood, is diverse and extensive. On top it requires a great deal of specific outside playgrounds. In order to counter the lack of space, deal with the inside-outside complexity of programs and allow for the public path to pass, the maximum building envelope is divided in two halves: one compact building housing all interior functions, and an outside space in which the playgrounds are stacked. In between both, and under a first level playground realized in glass tiles, the path crosses the volume.
A galvanized steel skeleton unifies the two halves. On the side of the interior volume, the façades of the building are designed as a patchwork of opaque and translucent polycarbonate, glass, and aluminium louvres. The outside structure will be overgrown with vegetation climbing along a steel mesh, in which some large ‘windows’ are cut out.
Place: Kompasplein 1, 9000 Ghent, Belgium
Programme: Multipurpose school building
Year: 2015-2020
Status: built (09/2017 – 02/2020)
Client: sogent
Plot Surface: 2625 m²
Surface: 4630 m² (interior) + 3050 m² (exterior)
Volume: 24500 m³ (interior) + 28000 m³ (exterior)
Budget: 10.000.000 excl. TVA (and studies)
Designer: XDGA (Xaveer De Geyter Architects)
Competition:Xaveer De Geyter, Doug Allard, Thérese Fritzell, Ingrid Huyghe, Willem Van Besien, Stéphanie Willocx
Definitive design: Xaveer De Geyter, Karel Bruyland, Thérese Fritzell, Arie Gruijters, Ingrid Huyghe, Willem Van Besien, Stéphanie Willocx
Implementation: Xaveer De Geyter, Ingrid Huyghe, Willem Van Besien
Consultants: Ney & Partners (structure), Studiebureau Boydens (mechanical), Daidalos Peutz ingenieursbureau (acoustics)